Strategic Partnerships with Our Erectors: Vail Solaris Building

Solaris Vail

When building Solaris Vail, the job’s large scale was challenged with a small job site. We utilized Just-In-Time delivery sequences to assist the erector with a job site constraint of having little to no laydown area.

16th and Chestnut

There was zero laydown area on the 16th and Chestnut job site which required us to carry out Just-In-Time delivery sequences on each level as the building was erected. Our project managers utilize a sophisticated operations management system to do so.

Strategic Partnerships with Our Erectors: DaVita Tower Steel Erection
Strategic Partnerships with Our Erectors: Safely Loaded Steel Truss

Safely Loaded Steel Truss

Workplace safety is paramount to the success of your project…we take extra precautions on our end to ensure your product can be unloaded safely and efficiently.

Learn More About How We Manage a Project’s Lifecycle…

Design Assist

Pre-Construction Optimization

Production Execution

Erector Partnerships

  • AISC – BU, Certified Building Fabricator
  • AISC – IBR, Certified Bridge Fabricator, Intermediate
  • AISC – CBR, Major Steel Bridges
  • AISC – FCE, Fracture Critical Endorsement
  • AISC – CCE-1,2,3 Complex Coatings Endorsement
  • 150,000 sq. ft. Facility
  • 20,000 sq. ft. Enclosed Surface Prep & Paint Area
  • 15,000 tons annual capacity
  • Combined 50 ton Crane Lifting Capacity
  • Automated Beam Processing
  • Drilling, Shearing, Coping & Cambering
  • Forming
  • Plasma & Laser Cutting
  • Saw Cutting
  • Machining

Multi-Level Buildings | Offices | Hospitals | Schools | Resorts | Bridges & Highways | Handrails & Stairs | Misc. Metals

We are hiring...are you looking for an exciting career in the industry? Zimmerman offers technical, skilled trades and back-office careers in a reputable team with over 7 decades of manufacturing excellence legacy in high technology applications.